A host move starts with a full copy of the files and database, then a test run on the new server. Before pointing DNS at it, we lower the DNS time-to-live so the switch spreads quickly, and we check email records (MX, SPF, DKIM) so that mail keeps flowing. SSL is issued on the new host before traffic arrives.
A domain move has its own rules. The registrar must unlock the domain and give you an authorization code, and a recently registered or transferred domain can be locked for a period under ICANN rules. If the address itself changes, Google Search Console’s Change of Address tool and site-wide 301 redirects tell search engines where the site went. Check the current requirements of your registrar and of Google, because interfaces change.
Moving a project between platform accounts is simpler, but the same things tend to break: the connected domain, payment providers, CRM and email integrations, analytics and conversion events, webhooks and API keys, and the subscription (a plan belongs to the account). We do the transfer by checklist: first record everything that is connected, then transfer, then test every integration. We only need access to both accounts or the participation of the owners.