CRM audit: where your sales pipeline loses customers and what to fix first

We take your CRM apart from the inside: the pipeline and stages, fields and data, workflows and integrations, how reps actually work. We show where leads are lost and why the reports don’t help, then draw up a prioritized plan of fixes. It suits HubSpot, Salesforce, Pipedrive, Zoho and other systems.

Reply within 15 minutes · project assessment — free · pricing on request

3D glass blocks assembling into a web page — a metaphor for modular website development

A CRM audit is a review of the system’s settings and data: the pipeline and deal stages, fields, automation, integrations, user permissions and reports. A sales pipeline audit shows at which stages customers are lost and why. The result is a prioritized list of problems and a plan of fixes.

When you need a CRM audit

Signs that the system isn’t working at full strength.

“We have a CRM, but we can’t trust the reports”

The data is filled in partially, stages are used in different ways and decisions can’t rest on the numbers.

We check data quality and entry rules and find the causes of discrepancies. We establish which metrics can be treated as reliable.

“Leads keep coming in, but sales are lower than expected”

It is unclear where customers are lost: at the first reply, at the quote or at payment.

We analyze the pipeline by stage and source: where deals stop and what lost deals have in common.

“The settings piled up over the years and nobody knows what works”

Dozens of fields, workflows and integrations nobody has reviewed. Some get in the way and some duplicate each other.

We inventory the configuration: what is used, what is redundant and what is broken. We produce a map of the system.

“We plan to change CRM or expand it, but don’t know where to start”

There is a risk of paying for a migration when the problem is the configuration, not the system.

We assess whether the current system can be fixed or needs replacing. For the alternatives, see CRM implementation.

What we check in a CRM audit

We adapt the set of checks to your system and team size.

Pipeline and stages

Do the stages match the real customer journey, are exit criteria clear, are loss reasons recorded, are there dead stages.

Data quality

Completeness of key fields, duplicate contacts, lead sources, and whether tasks and deals are up to date.

Automation

Do workflows and tasks run, are there conflicting rules, do deals get left without a next step.

Integrations

Do website leads, calls, messages and accounting data arrive, and are there losses or duplicates along the way.

How reps work

How reps use the system, where they work around it and how they record the results of conversations.

Permissions and security

Who sees and can change what, whether there is excess access, and whether backups and exports are in place.

Reports

Which reports exist, whether they answer the manager’s questions and whether the numbers match reality.

From website to deal

We check how a customer travels from a website visit to a lead and a deal, and where inquiries are lost on the handoff to the CRM.

How a CRM audit runs

The audit doesn’t change your data: we work with read-only access and test deals.

Step 01

Brief and access

We clarify your goals and suspicions and get read-only access to the CRM, the reports and the integrations.

Step 02

Settings and data analysis

We check pipelines, fields, workflows, integrations, data quality and permissions.

Step 03

Interviews

We talk to reps and the manager to understand how the system is used in practice.

Step 04

Pipeline analysis

We look at how deals move through stages and sources and pinpoint the bottlenecks.

Step 05

Report and plan

We deliver a document: the problems found with priorities, what to fix, what to leave and the effect we expect. We go through it in a meeting.

Free project estimate and quote

Leave your contact — we'll review the task and send a quote with a scope breakdown and timelines. No pushy sales call.

Thank you! Request received — we'll get back with the estimate and quote within one business day.

A quick self-check of your sales pipeline

If several of these answers are “no”, you probably need an audit.

  • Every lead from every channel reaches the CRM automatically.
  • Every deal has an owner and a next step with a due date.
  • For each stage it is clear what moves a deal into it.
  • A loss reason is recorded when a deal is closed as lost.
  • The lead source is captured automatically, not typed in by hand.
  • There are no duplicate contacts or deals for the same customer.
  • The reports match your accounting and billing data.
  • Reps work with customers in the CRM, not in personal messengers and spreadsheets.

Who it’s for, and who it isn’t

A good fit if

  • The CRM is in place, but the results don’t match expectations.
  • You need to understand where the sales pipeline loses leads and what to fix first.
  • You want an objective assessment before growing the team or changing the system.
  • The system came from a previous contractor and nobody knows how it is configured.

Not a fit if

  • You don’t have a CRM: start with implementation, since there is nothing yet to audit.
  • You only need one integration configured: that is a separate task, see website CRM integration.

Sales pipeline audit and website funnel audit

The sales pipeline in a CRM shows a deal’s path from lead to payment. The website funnel is a visitor’s path from first visit to inquiry. They are two stages of one journey, and the problems differ: the website loses visitors at the form, while the CRM loses leads at the first reply and at approval. In an audit we look at both sections and at the handoff between them: whether a website lead reaches the CRM with its source, and who handles it.

Analytics helps evaluate the website side: goals, forms and visitor behavior. We cover that as part of marketing attribution. The CRM audit focuses on what happens after the inquiry.

To learn how a sales pipeline is structured and which stages it can have, read what a sales funnel is and the sales pipeline in a CRM. After the audit you can fix the problems yourself or ask us to do it.

What you get from the audit

The result of the audit is a document you can work from without us. It describes the current scheme of the system, lists the problems by their effect on sales and says what to fix right away, what to schedule and what to leave as it is. For each item it describes exactly what has to change in the settings, so that you or another contractor can carry out the work.

We also show what works well in the system: not everything needs rebuilding, and unnecessary changes only do harm. If the audit shows that it is easier to replace the current CRM than to fix it, we will say so and explain why.

FAQ: CRM audit

A review of the pipeline and stages, fields and data, automation, integrations, permissions and reports, plus interviews with reps. The result is a document with problems, priorities and a plan of fixes.
It is an analysis of how deals move through the stages: where they stop, why they are lost, and how sources and reps differ. It shows at which step you lose customers.
We need read-only access to the CRM, the reports and the integration settings. We don’t change any data during the audit and we work under a contract with a confidentiality clause.
Yes. The report is written so that your staff or another contractor can carry it out. If you prefer, we can make the fixes ourselves.
We most often work with HubSpot, Salesforce, Pipedrive and Zoho CRM. For other systems we assess feasibility separately: we need access to the settings and the data.
We estimate after a brief: it depends on the size of the system and the number of pipelines and integrations. For general guidance see the pricing page.

Tell us about your task — we'll come back with a quote and timeline

In response you'll get a project estimate, a quote broken down by scope, and timelines. Usually within one business day. Free, no strings attached.

4 of 6 project slots open this week.

Request received

Thank you! We'll get back with the project estimate, the quote and the timeline — usually within one business day.

Get an estimate